RACI charts are actually missing a letter

A RACI chart settles who does the work and who owns the outcome. What it doesn't settle is who makes sure anyone actually uses it. The missing letter is E, for Enforcer.

Aleksandra Obradović··3 min read
Black ink wash painting of a woman with her hair in a bun, seen from the chest up, holding a rooster against dark, smudged brushwork.
Marta Ehrlich, Žena s pijetlom (Woman with a Rooster), 1952. Marta Ehrlich, via Akademija art.

TL;DR: A RACI chart settles who does the work and who owns the outcome. What it doesn’t settle is who makes sure the chart gets filled in, revisited, and used when something goes wrong. Without that, it’s just another table in just another document. The missing letter is E, for Enforcer, and it should actually sit above the table.

What are RACI charts

A RACI chart is basically a “who does what?” table for a project.

RACI stands for:

Letter Meaning ELI5 version Shortcut
R Responsible Does the work R = Who is doing this?
A Accountable Owns the result / has final responsibility A = Whose problem is it if this doesn’t happen?
C Consulted We ask them before/during the work C = Whose input do we need?
I Informed We tell them what’s happening I = Who needs to know?

And many confuse the terms Responsible and Accountable.

When a bug needs to be fixed:

  • the developer is Responsible because they investigate the code, implement the fix, open the PR, etc.
  • the engineering lead might be Accountable because they ultimately own whether the technical work gets completed properly.

RACI in the wild

Let’s see how it works on a specific example. Your software team is releasing a new feature: “Users can reset their password via email.” The problem RACI solves is: who is actually supposed to do what, and who gets the final say?

Task PM Developer QA Designer Eng Lead
Define requirements A/R C C C I
Design reset flow C C I A/R I
Implement backend I R C I A
Implement frontend I R C C A
Test feature I C A/R I I
Decide feature is ready A C R I C
Deploy to production I R I I A

Four letters are not enough

RACI forces the team to decide beforehand who owns each piece. In theory, that sounds amazing. Super useful for cross-team initiatives. In most teams I’ve seen, however, the chart exists and nothing makes anyone follow it. It is optional to fill it in, it is optional to revisit it, and when a dispute comes up nobody is really required to open it. If there is no one to enforce this division of labor and responsibility, the chart will remain just a cute little table buried deep in the documentation.

Just to be clear: RACI does have relatives: RASCI adds a Support role, and DACI replaces Responsible and Accountable with Driver and Approver. They refine who does what, but none of them answers who makes sure the chart gets used.

So, you could say that the RACI chart is actually missing a letter E, for Enforcer. E doesn’t belong in a table next to the other letters, because the Enforcer is responsible for the table itself. The Enforcer shouldn’t be a peer as they need to have authority over the people in the chart. If you adopt a RACI chart, also decide who enforces it and name that person at kickoff.

Share
Written by
Aleksandra Obradović

Curious about technology, product thinking, and anything worth reading.

Continue reading

A quieter inbox.

Sent occasionally, whenever there's something worth sharing — new essays, things worth reading, no fixed schedule.

Free. Unsubscribe in one click.